I have Solar! It just took FAR longer to do than I thought it would. Running and routing the 12/3, (12 gauge, 3 conductor) 28 foot run to the Breaker panel was every bit the Pain-in-the-Ass I thought it would be. I had to route over and around cross-beams, waste tanks, and heater ducting. But … Continue reading Solar Project, Part 4b: Finished